Heading www.gapilot.co.uk

Build Diary 27/28-December-05


Christmas is over, and Jo has got me lots of bits for my RV project and some tools - she is great. Topcoat painted the instrument sub-panel, panel brace and started to rivet it into place.

Pleased with the topcoat painting the fuse side rails.

Riveting the instrument sub-panel.
These rivets went in very well considering the position they are in.
Two flush rivets bu the canopy hinge.
Instrument brace to firewall rivets.
Instrument panel brace to firewall rivets.

I fitted this tape to protect the paint from the bucking bar and rivet gun.
One half of the instrument sub-panel fitted.

Second side fitted.



Images & text copyright GAPilot & Go-7. This mail is not connected to Vans Aircraft Inc. The contents of this site is the opinion of the author, not Vans Aircarft, PFA, CAA or FAA. Please check all information is correct before you act upon it.