Heading www.gapilot.co.uk

Build Diary 22-June-05


Continued work on the canopy - Fitted canopy side rails.

Smoothing ridges from the top and bottom of the canopy side rail angle.
Marking the rivet and rear catch positions.
I first drilled #40 in the angle, then attached to the rear hoop. I will then match drill them together to #30 for AD4 rivets
The side rail to front section canopy attachment plate. After checking alignment I attached it ro the side rail first, as it must sit snug the the bottom of the rail.











Images & text copyright GAPilot & Go-7. This mail is not connected to Vans Aircraft Inc. The contents of this site is the opinion of the author, not Vans Aircarft, PFA, CAA or FAA. Please check all information is correct before you act upon it.